3. Determine Total Cost — Riftbound Rules

Section 403 — 6 rules

403.1.
Determine the base cost of the Ability.
403.1.a.
Activated Abilities will have a cost listed before the “:” in their text.
403.1.b.
Triggered Abilities will typically not have a base cost associated with them when placed on the chain due to their conditions.
403.1.b.1.
If a Triggered Ability has a cost within instructions (e.g. “[do X] to [do Y]”), the cost is taken as the base cost. See rule 742.1. for more information on costs within instructions.
403.2.
Apply cost increases and decreases as a result of choices made in the prior step. See rule 349. Playing Cards for more information.
403.3.
Apply any other cost increases or decreases as necessary. See rule 349. Playing Cards for more information.